Jun 2023

We recently filmed and edited a case study video for Shared Access, who are an independent owner, operator and investor in wireless connectivity solutions. This project was in partnership with their marketing agency.

Shared Access were recently appointed to install a mobile connectivity infrastructure inside The National Gallery offices in London, with One Gallery Hub being the new office accommodation at the heart of the famous Grade I listed building. It has been designed to offer seven floors of collaborative and efficient work spaces for over 250 gallery staff – as well as offering support for those working from home.

Shared Access wanted to explain the project in a case study video, so we were briefed to film on location at The National Gallery and at Salisbury House, where the Shared Access BTS Hotel is located and connects to The National Gallery via dark fibre over four miles. Limited available space at The National Gallery required an innovative solution for siting of the extensive telecoms equipment needed to service the connectivity. We also filmed a fly-through in the streets of London to demonstrate the connection between The National Gallery and the BTS Hotel.

After a successful (and long!) day of filming, it was then time to begin the editing process. We cut together the interview clips of Shared Access’ Sam Jackman and The National Gallery’s Len Nunn with b-roll of the work spaces, the BTS Hotel and London. We added custom motion graphics to really bring the concept to life, including the on-brand ‘swoosh’ through the streets of London to demonstrate the connectivity.

Thanks to Shared Access and The National Gallery for a great project!

Scroll down to the bottom of the page to watch the finished video.

Here are a few behind the scenes photos of the FLYTE and the marketing agency team: